Kids Remodel - Update March 10

The stage is decked out and the sheetrock is showing the shape of the three walls that will have a projector on them. 
Electrical, HVAC, fire safety, and low voltage conduit for audio/video/lighting stuff is being installed to make this a useful, engaging and safe place for the next generation at College Church!
The sheetrock on the back side of the stage that runs beside the metal studded wall serve as storage along the back side of the stage and can be accessed from multiple doorways. 
Posted in
Tagged with ,

No Comments


Recent

Archive

 2022

Categories

Tags